Artificial flowers, plants and trees — factory direct since 2008

Wedding & Event

Table Centrepiece Set of 3 — Event Table Flowers

Three ceramic vase arrangements sized 12/16/20 cm for banquet and wedding tables. Ships assembled and ready to place.

  • ModelWD7012
  • MOQ100 pcs
  • Lead time22 days
  • MaterialSilk, ceramic vase
  • SizeVase 12/16/20 cm
  • Packing quantity12 pcs/carton
  • Packing3 pcs/set, 12 sets/carton
Colours IvoryDusty PinkGreen White
Request price

Prices are quoted per order — send quantities and destination port for FOB, CIF or door-to-door pricing.

Product details

A practical trio for banquet layouts: graded heights create depth across a long table without adding extra florist labour.

  • Ceramic vases with weighted bases
  • Colour palettes matched to your event
  • Packed to survive sea freight

Specification

ModelWD7012
Vase heights12 / 16 / 20 cm
MaterialSilk flowers, ceramic vase
MOQ100 sets
Packing3 pcs/set, 12 sets/carton

Frequently asked questions

How do I get a quotation?

Add products to your inquiry list or email us the model numbers and quantities you need. We reply with pricing within 24 hours on business days.

Are you a factory or a trading company?

We are a factory-direct manufacturer. Production, dyeing, assembly and packing all happen in our own workshop, which is why we can control quality and lead time.

What is the minimum order quantity?

MOQ depends on the product and usually starts from 100-300 pieces per colour. Smaller trial orders are possible for most items so you can check quality before committing.

Can I order samples before bulk production?

Yes. We ship samples worldwide and the sample cost is refundable against your first bulk order for most items.

Do you offer OEM and ODM?

Yes. Custom colours, flower heads, stems, bunch sizes, packaging and private labelling are all available. Send reference images or a physical sample and we will develop it for you.

How long is production and shipping?

Samples take 7-12 days. Bulk production is usually 15-30 days depending on quantity and season. Sea freight takes 25-40 days, air freight 5-10 days, and express 3-7 days.

Related products